How PC.o compares

PC.o does most of what the three do, a little more in places, for a lot less money, with less to learn and nothing to install.

Schedules similar to P6 or similar to Microsoft Project — your choice per schedule. Switch between the two on screen, with a dry run and a change log.

How the PC.o Scheduler stands against the three tools most planners already know. The PC.o column is what is in the product today (the Scheduler is in beta); the other three columns are from each vendor's public documentation, October 2026.

Download the PDF

92%
PC.o Scheduler
of 75 features

Browser only. $25 / month or $200 / year on top of a Basic or Pro plan; 10 field updaters included.

69%
Microsoft Project
of 75 features

Project Professional / Standard desktop (Windows) and Planner Premium (web). Plan 1 about $10, Plan 3 $30, Plan 5 $55 per user per month; desktop one-time from about $680.

71%
Primavera P6
of 75 features

P6 Professional (Windows), P6 EPPM (web) and Primavera Cloud. Named-user licences in the thousands of dollars, cloud by quote.

54%
Smartsheet
of 75 features

Browser and apps. Pro about $12 and Business about $24 per member per month billed yearly; Resource Management and Control Center are add-ons.

A feature the product has counts 1, a partial one or a paid add-on counts ½ (yes 1, partial or add-on ½), over the same 75 features for each column.

The simple facts

FactPC.o SchedulerMicrosoft ProjectPrimavera P6Smartsheet
Price for one full scheduler seat$25 / month or $200 / year, on a $25 Basic planPlan 3 $30 / user / month; desktop from about $680 one-timeNamed-user licences in the thousands; cloud by quotePro about $12, Business about $24 per member per month; add-ons extra
Field people who answer update requests10 included, no licence; packs of 10 at $5 / monthA licence eachA licence each (Team Member)Free by email
InstallNothing: a browser on Mac, Windows or iPadWindows desktop app; Planner Premium in the browserWindows desktop; EPPM / Primavera Cloud in the browserNothing
Opens the files people already haveXER, P6 XML, MPP, Project XML, Excel look-aheads, PDF outMPP, Project XML, Excel; no XERXER, P6 XML; Project XML with care; ExcelMPP and Excel in; Excel and PDF out
Time to a first scheduleMinutes: pick one of four ways in, type names in blank rows, links by nameAn afternoon with the desktop appDays: EPS, OBS, calendars, codes before the first activityMinutes, as a sheet
Scheduling depthBoth rule sets, calendars, constraints, float, longest path, LOE, EV, cash flowFullFull, the deepestDependencies and a critical path; no float, constraints or data date
The analysis of the schedule's qualityBuilt in: the PC.o analysis, Word report, comparison, freshnessAdd-insPrimavera Cloud schedule check; add-ins for P6None

Feature by feature

✓ Yes◐ Partial or add-on○ No

FeaturePC.o SchedulerMicrosoft ProjectPrimavera P6Smartsheet
What only PC.o does
Two rule sets in one tool: scheduling similar to P6 (Advanced engine) or similar to Microsoft Project (Standard engine), chosen per schedule YesAdvanced or Standard engine, per schedule NoIts own rules only NoIts own rules only No
Converts a schedule between the two rule sets on screen, quickly YesOn screen: dry run, then a change log of every moved date NoExport / re-import only NoExport / re-import only NoExport / re-import only
Scheduling engine
Critical path method, forward and backward pass, total and free float YesBoth engines; JS and C# agree Yes Yes PartialCritical path shown; no float columns
Relationship types FS, SS, FF, SF with positive and negative lag YesLag calendar option; % and elapsed lags in Standard Yes Yes YesLag in days
Data date and progress rules (retained logic, progress override, actual dates) YesPlus Update as planned by dragging the data date PartialStatus date with split and move options Yes NoNo data date; % complete only
Constraints (start or finish on, on or before, on or after, mandatory, as late as possible, expected finish, deadlines) YesSecondary constraint too YesEight types plus deadlines YesNine types NoDates follow predecessors or are typed
Must finish by driving negative float Yes PartialProject finish deadline Yes No
Longest path and multiple critical paths YesLongest path; multiple critical paths in Standard PartialMultiple critical paths option; no longest path YesLongest path and multiple float paths No
Activity types: task, start and finish milestones, level of effort, WBS summaries YesLOE in Advanced; WBS summaries roll up PartialMilestones and summaries; no LOE YesPlus resource-dependent and WBS summary activities PartialMilestones and parent rows
Calendars per activity with shifts, exceptions and partial days; an account library YesGraphical calendar editor; two built-ins YesBase, task and resource calendars YesGlobal, project and resource calendars PartialOne working-days setting per sheet
Suspend and resume, or splits YesOne suspend in Advanced; splits in Standard YesSplits YesSuspend and resume No
Manual and inactive tasks YesStandard engine Yes No PartialDependencies can be turned off
Auto schedule or schedule on demand (F9) Yes Yes YesF9 YesAuto only
Resource-driven durations and resource calendars NoDurations are fixed in v1 Yes Yes No
Editing and the sheet
Four ways in: Standard or Advanced rules × Simple or Full mode, so each kind of planner, a field person or a beginner starts on a familiar footing YesPick the pair when you open or create a schedule; switch later PartialOne rule set; Planner Premium is a separate, simpler product NoOne system, one way of working PartialOne simple way of working; card and grid views
Spreadsheet feel: type into blank rows, a cell cursor, Enter, F2, Delete, ranges, fill down YesMac keys too Yes PartialColumns edit in place; add a row by command YesIt is a sheet
Copy and paste to and from Excel as a table; paste a list of activities YesA table round trip with outline level; a pasted list from Word or Excel becomes activities Yes PartialPaste into columns is limited Yes
Typed durations and dates (3w, 10d, mon, +3d, 12/1) YesIn every cell and in Details Yes Partial Yes
Undo and redo YesMulti-step, including structure edits Yes PartialLimited undo Yes
Structure edits: indent, outdent, move rows, insert a fragnet Yes Yes Yes YesIndent and move; no fragnets
Drag bars with the rules explained in a toast Yes PartialDrag; no explanation PartialDrag; no explanation PartialDrag
Links typed by shorthand (A1020FS+2d) or by name YesShorthand on short activity IDs; names in Simple mode YesRow numbers PartialDialogs YesRow numbers
A Simple mode for field people (six columns, links by name) and a Full mode YesRemembered per user and schedule PartialPlanner Premium is the simple product; a different app No PartialCard view
Activity details as a floating window or a bottom pane, with a toggle Yes YesTask form and Task Information YesBottom details PartialRow panel
Save your own defaults for new schedules YesSave as my defaults in the New schedule dialog YesTemplates and options YesTemplates and user preferences YesTemplates
Phone and tablet editing YesTouch layout under 600 px, pinch zoom PartialPlanner app; desktop needs Windows PartialTeam Member app for updates YesApps
Gantt, views and printing
Gantt with logic lines, critical and longest-path colouring, data date line YesOwn renderer, lines routed to off-screen partners Yes Yes YesDependency lines and critical path
Baseline bars under the current bars YesActive baseline strip; variance columns YesUp to eleven baselines YesUp to three shown PartialOne baseline
Non-working time shading per activity calendar, exceptions drawn YesToggleable Yes Yes PartialSheet-level
Search, filters (critical, late, status, owner, open ends) and sorting inside or without the WBS Yes YesPlus grouping and custom fields YesPlus grouping by codes YesFilters, sort, conditional formatting
Grouping by activity codes or custom fields NoCodes kept for the round trip only Yes Yes PartialReports group by columns
Column chooser with computed (Σ) columns and presets; saved views per user YesDefault, Scheduling, Costs, Baseline, Simple, Custom YesTables and views YesLayouts YesSaved views and reports
Light and dark theme Yes PartialOffice themes No No
Print to PDF with fit to width, header and footer, optional row numbers Yes Yes Yes Yes
Three-week look-ahead view YesDefault in the viewer; Excel export PartialFilter PartialFilter and layout PartialFilter
Costs, resources, earned value, cash flow
Resource dictionary with dated rates; assignments with budgeted, actual and remaining units; expenses YesDated rates and limits; the Calendar column names the project calendar and its hours Yes Yes PartialColumns and formulas; Resource Management add-on for people
Cost roll-up to WBS and project, EAC, cost variance Yes Yes Yes PartialFormulas
Earned value from a baseline: BCWS, BCWP, SPI, CPI, SV, CV, VAC, TCPI YesBCWS from the pinned baseline by working day; SPI, CPI, SV, CV, VAC, TCPI in the Cost summary, the headline and Details YesDesktop, with a baseline and status date Yes No
Cash flow by week, month, quarter or year YesWeek, month, quarter or year in the live panel and the usage tab YesReports and task usage YesResource and cost spreadsheets PartialFormulas and charts
Early versus late cash flow envelope with the baseline S-curve inside it YesEARLY BASE and LATE BASE rows; the baseline S-curve from the pinned baseline PartialVia reports YesProfiles No
Spread curves: standard shapes and your own 21-point curves, saved in a library YesTen standard curves and your own 21-point curves in a library; a manual spread per assignment YesEight work contours on assignments YesResource curves, 21 points No
Max units per resource, overallocation marks, a resource usage histogram YesMax units per day on the rate row; the overload marks count weeks; the Resource usage tab opens in units with the limit line; dated limits Yes Yes Add-onResource Management
Resource levelling NoYou see the overload by week and decide what moves; no automatic levelling Yes Yes No
Headline strip: critical count, negative float, finish, EAC and CPI live while editing YesCritical, negative float, finish, EAC, CPI and SPI, live while you edit PartialProject statistics PartialProject details PartialSheet summary
Baselines, analysis and comparison
Baselines by reference: any schedule, pinned revision, several per schedule, an active one YesA baseline is a whole schedule you can open and analyse; the upload is the copy's baseline by default YesEleven baselines as fields inside the file; dates and cost only YesBaseline projects, hidden until exported or assigned PartialOne baseline
Schedule quality analysis (DCMA-style checks) and a Word report, from the same tool YesThe PC.o analysis the Scheduler sits on; run in place NoThird-party add-ins PartialSchedule check in Primavera Cloud; third-party for P6 No
What moved after a reschedule YesDiff of dates with a toast PartialChange highlighting No PartialCell history
Compare two updates (dates, logic, critical set) YesThe PC.o comparison report PartialCompare Projects utility YesClaim Digger / schedule comparison PartialVersion history
Analysis freshness: the report says which revision it was run on; rerun on demand or on close YesThe out-of-date pill everywhere the schedule shows No No No
Back to the last analysed revision in one step YesOne step, undoable until you leave the page; a save of unchanged content writes no revision PartialUndo or a saved copy PartialReflections PartialVersion history
Trends across updates and a project dashboard No PartialProject Online reports YesEPPM dashboards YesDashboards
Updates from the field
Send update requests to people with no licence; they answer from a phone link YesPhone cards or a wide Gantt; the link dies on submit NoA licence per team member PartialTeam Member licence; timesheets YesUpdate requests by email
Field answers carry schedule logic: actual or estimated start and finish feed the engine YesReview, apply accepted, set the data date PartialThrough Project Online task updates YesThrough Team Member NoCells update; no scheduling rules
Review before applying, who has answered, cycle history, reminders Yes Partial Partial PartialAutomations
Pricing of field updaters Yes10 included; packs of 10 at $5 / month NoLicence each NoLicence each YesFree for the recipient
Import, export and files
Open XER and P6 XML YesAdvanced engine No YesNative No
Open MPP and Project XML YesStandard engine YesNative PartialProject XML PartialImport
Export XER and P6 XML, with a conversion log YesRound-trip tested No Yes No
Export Microsoft Project XML (Project opens it) or .mpp YesFrom the Scheduler's File ▸ Export (both engines, the pinned baseline as Project's Baseline) and from Files ▸ Convert; the binary .mpp itself is not written Yes PartialProject XML NoExcel, PDF, image
Open an Excel schedule or look-ahead and edit it as a schedule YesStart On constraints for dates; opens in Simple mode PartialExcel import wizard PartialExcel import YesImport a sheet
Excel export, PDF print Yes Yes Yes Yes
A portable file of our own (.pcosched) with the model as the record Yes Yes.mpp Yes.xer No
Collaboration and sharing
Autosave with recovery after a closed window Yes2 s / 30 s, browser recovery PartialDesktop saves on demand; web autosaves PartialDatabase commits Yes
Who is editing: a single-editor lock with Take over, viewers see everything Yes PartialCheck-out in Project Online YesMulti-user on the database YesReal-time co-editing
Several people editing the same schedule at once NoOne editor, any number of viewers PartialPlanner Premium Yes Yes
Read-only share links: a frozen state, or a live link that follows the schedule YesBoth; the live link is revocable and 30 days PartialSharePoint and Power BI PartialEPPM portal YesPublished links
Pop-out window per schedule, the Files page stays put Yes YesDesktop windows Yes PartialTabs
Group seats managed by the account manager YesA Scheduler pool per group Yes Yes Yes
Dashboards, forms and automations NoDashboards arrive with projects and portfolios PartialPower BI, Power Automate PartialEPPM dashboards YesA core strength
Platform, access and pricing
Runs in a browser on Mac, Windows and iPad, nothing to install Yes PartialDesktop is Windows only; Planner Premium in the browser PartialP6 Professional is Windows; EPPM and Primavera Cloud in the browser Yes
Price for a full scheduler seat Yes$25 / month or $200 / year on a Basic or Pro plan PartialPlan 3 at $30 / month; desktop from about $680 PartialThousands per named user PartialPro about $12 / member / month; add-ons extra
Free trial that includes the scheduler Yes30 days PartialTrials No PartialTrials
Schedules stay readable after the subscription ends YesView-only, the analysis unaffected PartialFiles stay on disk Partial PartialRead-only
Short chaptered how-to videos inside the product Yes31 videos, one topic each Yes Yes Yes
Beta label with Send feedback YesOn the header, the plan card and the public pages; one switch No No No

Where PC.o is different

  • Two rule sets, one tool. Scheduling similar to P6 (the Advanced engine) or similar to Microsoft Project (the Standard engine), chosen per schedule.
  • Switch between them on screen. A schedule moves from one rule set to the other in the browser, with a dry run and a change log of what moved, and Files > Convert converts between the file formats.
  • Four ways in. Standard or Advanced rules, Simple or Full mode: whoever you are coming from, or if you are starting fresh, one of the four already looks like what you know.
  • Field updates without licences, with logic. Anyone answers from a phone link; the answers become actual or estimated dates the engine schedules, after review.
  • Analysis in the same place. The schedule quality analysis, the Word report, the comparison and the freshness pill are part of the editor, not a separate product.
  • Baselines you can open. A baseline is a real stored schedule, not fields inside a file: open it, compare it, print it, run the analysis on it.
  • Cash flow the way a planner reads it: the early and late envelope with the baseline S-curve inside, standard and custom spread curves, and the live panel while editing.
  • Price and reach. $25 a month on a Basic plan, browser only on Mac, Windows and iPad, with a 30-day trial.