How PC.o compares for schedule analysis

Hundreds of dollars a year, not thousands, and simple to use: PC.o covers analysis, comparison, look-aheads, conversion and link sharing in one browser tool, with DCMA as the standard and the rest left to each user's own measures. Acumen Fuse and Steelray put one number on the schedule, let users write their own checks and slice results by area.

Hundreds of dollars a year, not thousands, and nothing to install. Analysis, comparison, look-aheads, convert and clean, and a Gantt you can share by link, all in the browser.

How PC.o's base product (analysis, comparison, look-aheads, convert and clean, the Gantt viewer and sharing) stands against the three schedule-analysis tools planners name most: Deltek Acumen Fuse, Steelray Project Analyzer and XER Schedule Toolkit. Every vendor cell comes from the vendor's own public documentation; where a feature was not found there it is marked no.

Download the PDF

84%
PC.o
of 76 features

Browser only. $25 / month or $200 / year; group seats the same each; 30-day trial, no card.

72%
Deltek Acumen Fuse
of 76 features

Windows desktop (Mac only through Parallels or VMware). Named, concurrent or server licences; thousands of dollars a year per seat, exact price by quote.

53%
Steelray Project Analyzer
of 76 features

Windows desktop. Microsoft Project only: $1,575 / user / year or $157.50 / month; Analyzer for P6 $990 / year.

68%
XER Schedule Toolkit
of 76 features

Browser, hosted on AWS in Ireland. From £29.99 / month or £199 / year + VAT; viewer seats come in bundles.

A feature the product has counts 1, a partial one or a paid add-on counts ½ (yes 1, partial or add-on ½), over the same 76 features for each column.

The simple facts

FactPC.oDeltek Acumen FuseSteelray Project AnalyzerXER Schedule Toolkit
Price for one user$25 / month or $200 / yearThousands a year per seat; exact price by quote$1,575 / year for Project; Analyzer for P6 $990 / year£29.99 / month or £199 / year + VAT
InstallNothing: a browser on Mac, Windows or iPad64-bit Windows app; Mac only through ParallelsWindows app with a small Project add-inNothing: a browser
Opens the files people already haveXER, P6 XML, MPP, Project XML, MPX, ExcelXER, P6 XML, MPP, Excel, Asta, Phoenix, Safran, P6 EPPMMPP, Project Server and Online; XER in the P6 editionXER, P6 XML, MPP
The DCMA 14-point assessmentAll 14, dashboard and Word report; limits fixedAll 14 with editable limits, among 600+ metricsAll 14 plus DECM, with a score and gradeA preset among 40+ checks, with a weighted score
Comparison of updatesIncluded: ties, durations, constraints, dates, calendars, trendsForensics over any number of snapshots; half-stepField compare and score trend; logic changes in the P6 editionDates, logic, durations, codes; constraints not named
DashboardsOverview, Cost and Details for analysis and comparisonDashboard, ribbons by WBS / code, phases by periodScorecards; no cost viewDashboard Creator; earned value dashboards
Sharing with people who have no licenceA link, no account; password and costs on or offSend Word, PDF or Excel filesSend Excel, Word or PowerPoint filesEach viewer needs a Toolkit seat; PDF and Excel out
Ease of use: time to a first resultMinutes: upload a file, open the dashboardAfter a Windows install, a licence key and an importAfter a Windows install; then open the .mppMinutes: upload an XER
Risk and delay analysisNoneMonte Carlo in the Acumen Risk add-on; half-stepDelay Analyzer add-on for XER filesNone
Reports of your own designPaid plans; your logo; Word and Excel; shareableBriefing text editable; more through the APIList, matrix, comparison reports; templatesOwn dashboards; bespoke reports on Enterprise

Feature by feature

✓ Yes◐ Partial or add-on○ No

FeaturePC.oDeltek Acumen FuseSteelray Project AnalyzerXER Schedule Toolkit
Inputs and formats
Primavera P6 XER YesRead and analysed; a multi-project XER splits into one schedule each YesRead directly; P6 need not be installed Add-onOnly in Analyzer for P6, $990 / user / year YesUpload an XER; pick projects from a multi-project file
Primavera P6 XML Yes Yes Nonot found in public docs; Analyzer for P6 reads XER YesAlso PLF layouts
Microsoft Project .mpp Yes Yes YesThrough a small Project add-in YesAlso MPT
Microsoft Project XML (MSPDI) Yes Nonot found in public docs; written, not read Nonot found in public docs Partial'XML' import listed; MSPDI not named
MPX Yes Nonot found in public docs Nonot found in public docs Nonot found in public docs
Excel schedules PartialRead and mapped on upload; not analysed or compared YesExcel data source with field mapping Nonot found in public docs Nonot found in public docs
Live connection to a P6 or Project database NoFiles only YesP6 EPPM web services, Project Server and Online PartialProject Server and Project Online; no P6 link NoFile upload only
Other formats (Asta Powerproject, Phoenix, Safran, Open Plan) PartialAnything else falls through to the MPXJ universal reader at upload; untested, analysis only, not the Scheduler or Convert YesAlso Cobra, UN/CEFACT, IPMDAR Nonot found in public docs NoNot natively; only through another tool's XER export
The DCMA 14-point assessment
All 14 points as a ready-made set, with a report YesDashboard panel, Word summary and full report YesStandard DCMA 14-point metric library Yes14-point report plus a configurable version YesPreset among 40+ checks; checks not itemised
Missing logic (open ends) Yes Yes Yes Yes
Leads and lags Yes Yes Yes YesLags named; leads inside the DCMA preset
Relationship types (finish-to-start share) YesPlus FF, SS, SF counts Yes Yes YesInside the DCMA preset (not itemised)
Hard constraints YesPlus soft, double and missed constraints Yes Yes YesExcessive constraints; hard vs soft not stated
High float and negative float Yes44 days or more flagged Yes44-day limit, editable YesLimits editable YesNegative float named; high float in the preset
High duration Yes44 days or more flagged Yes44-day limit, editable YesPlanning-period setting YesWeightable
Invalid dates YesActuals after the data date; confirmed in use Yes YesValid actual and forecast dates YesInside the DCMA preset (not itemised)
Activities without resources Yes Yes Yes Yes
Missed activities and BEI YesIn a comparison against the target Yes Yes YesLate starts / finishes vs baseline; BEI in the preset
Critical path test and CPLI Yes Yes YesNeeds a status date and a finish task YesInside the DCMA preset (not itemised)
More checks, limits and scoring
Checks beyond the DCMA 14 (out-of-sequence, near-critical, milestones) Yes100+ analysis metrics and 400+ comparison metrics over logic, float, durations, milestones, cost Yes600+ metrics YesSteelray criteria library and DECM checks Yes40+ checks
Other published standards (GAO, NASA, DECM) NoDCMA 14 only YesGAO, NASA STAT, DOE, DECM libraries YesDCMA DECM; GAO export only in older releases PartialNEC3 / NEC4 contract rules; GAO not found
Calendar checks PartialCalendar list and use; workday changes in a comparison Nonot found in public docs; calendar changes compared Nonot found in public docs PartialCalendar viewer; calendar checks not named
Set your own pass / fail limits YesPer item in a custom report: pass / fail, traffic lights or bands; the DCMA limits stay at the standard YesTripwire threshold editor YesRed / yellow / green limits per check YesRAG limits by percent or count; saved schemes
One score or grade for the schedule PartialBy design no single grade: pass / warn / fail counts per custom report, DCMA as the one standard Yes0-100 score and the Fuse Schedule Index YesWeighted 0-100% score, optional letter grade YesWeighted overall score, pass / fail
Write your own checks NoCustom analysis is built; not switched on yet YesMetric editor with Excel-style formulas YesCriteria Manager and filter builder PartialTune saved checks; bespoke checks on Enterprise
Drill to the failing activities YesDetail grid; Word or Excel of the rows you tick YesActivity Browser YesTask tables; jump to the task in Project YesClick a tile; Excel deficiency sheets
Comparison of updates
Compare two versions (target and update) YesIncluded in the base plan YesForensics tab, two or more snapshots YesSchedule Compare report YesCompare Projects
Added and deleted activities Yes Yes Yes YesAlso renamed activities
Date moves and slips YesEarly start / finish and late finish, with the difference YesVariance per field per snapshot YesGraph trails each task's dates over updates Yes
Logic changes (ties added, deleted, lag changed) Yes Yes PartialField compare; logic changes in Analyzer for P6 Yes
Duration changes YesRemaining and calendar duration Yes Yes Yes
Constraint changes YesType, name and date Yes PartialOnly by comparing the constraint fields Nonot found in public docs
Data date and progress (started, finished this period) Yes YesHalf-step splits progress from scope YesChanged actual starts and finishes PartialFull compare; progress changes not itemised
Critical path changes YesLongest path and float <= 0 sets Yes PartialCritical flag compared; no path-change report Nonot found in public docs
Calendar, code and resource changes YesWorkdays, codes, resources, settings YesAlso UDFs PartialField compare; calendars in Delay Analyzer PartialResources and codes; calendars not named
Trend over several updates YesAny metric across many schedules; Excel or image YesAny number of snapshots YesCheck scores per version YesSeveral versions at once
Earned value, cost and risk
Earned value (PV, EV, AC, SPI, CPI) YesBudget, EAC, EV, CPI, SPI; stored period values YesEV metric library; DECM and DOE EVMS sets PartialSPI and CPI checks from Project's EV fields YesBCWS, BCWP, ACWP curves
Cash flow, early and late YesAlso across several projects PartialCost per period in the phase analyzer Nonot found in public docs YesEarly and late S-curves
Dollars and quantities YesLabour, material, equipment, expense YesCost, duration and work by phase Nonot found in public docs YesCosts and units by resource or account
Resource histograms PartialIn the resource bar only; not elsewhere PartialResource ribbons; no histogram found Nonot found in public docs PartialFTE histogram
Schedule risk analysis (Monte Carlo) No Add-onAcumen Risk / 360 NoVendor points to a third-party tool Nonot found in public docs
Forensic delay analysis (windows, as-planned vs as-built) No PartialHalf-step analysis; no windows module Add-onSteelray Delay Analyzer (XER), $3,990 / year NoVersion compare marketed as forensic; no delay method
Benchmark against other projects No YesOpt-in Acumen Cloud benchmarking Nonot found in public docs Nonot found in public docs
Dashboards and reports
Overview and activity-detail dashboards YesOverview, Cost, Details tabs YesDashboard and Activity Browser YesScorecards; task tables per failed check YesDashboard Creator; viewer
Cost dashboard YesBudget, actuals, performance, cash flow PartialNo cost dashboard; widgets follow EV metrics Nonot found in public docs YesEarned value dashboards
Excel reports YesSummary, full, or the rows you pick Yes Yes Yes
Word or PDF reports YesWord: standard, DCMA, custom; no PDF YesExecutive briefing in Word or PDF YesWord and PowerPoint; no PDF found YesPDF summary; no Word
Custom reports of your own design YesPaid plans; your logo; Word and Excel; shareable PartialBriefing text editable; more through the API YesList, matrix, comparison reports; templates PartialOwn dashboards; bespoke reports on Enterprise
Trend charts Yes Yes PartialTask-date trail; score sparklines in the P6 edition PartialPeriod reporting; multi-update charts not shown
Slice the results by WBS, code or period PartialResource bar and cash flow by WBS / code; the checks are not sliced YesRibbons by WBS, code, resource; phases by period YesGrouped matrix by any field YesFilter checks by dates, codes, WBS
Look-aheads and Excel
Import a look-ahead from Excel YesAny workbook; the columns are mapped for you Nonot found in public docs Nonot found in public docs Nonot found in public docs
Create a look-ahead from a schedule YesFrom the Gantt viewer's Export menu; confirmed in use Nonot found in public docs Nonot found in public docs YesPreset look-ahead and look-back views
Compare a look-ahead against the schedule Yes Nonot found in public docs Nonot found in public docs Nonot found in public docs
Several look-aheads at once YesCompare look-aheads; one per worksheet Nonot found in public docs Nonot found in public docs Nonot found in public docs
Convert and clean
Primavera P6 to Microsoft Project YesWrites Project XML, not .mpp YesPublishes a P6-sourced scenario as Project XML Nonot found in public docs Nonot found in public docs
Microsoft Project to Primavera P6 YesXER or P6 XML PartialXER export exists; the Project-to-XER path not stated Nonot found in public docs Nonot found in public docs
Schedule to Excel Yes Yes Nonot found in public docs (results only) YesSchedule and Gantt
Global codes to project codes YesAlso calendars to project Nonot found in public docs Nonot found in public docs Nonot found in public docs
Remove costs, codes, quantities before sending YesXER files Nonot found in public docs; cleanse is for logic NoOnly a free macro outside the product PartialCost and units withheld when sharing
Fix the schedule and save it back Add-onScheduler add-on: edit, export XER or Project XML YesCleanse scenario published back to P6 or Project NoRead-only; fixes made in Project PartialProgress through SyncSheet (Enterprise)
Gantt, sharing and teamwork
Gantt viewer YesFilters, logic lines, longest path, detail panel YesSmartGantt with metric results Add-onSteelray Project Viewer YesRebuilt in 2.0
Share a view by link YesCosts on or off per link Nonot found in public docs Nonot found in public docs PartialRead-only shares to Toolkit accounts by email
Password on a link Yes Nonot found in public docs Nonot found in public docs NoNo public links; every share needs a sign-in
Links that update when the schedule changes Add-onScheduler add-on live link Nonot found in public docs Nonot found in public docs YesUpload Latest replaces the shared project
Print the Gantt to PDF YesThrough the browser's print dialog PartialViews print; Gantt to PDF not confirmed Add-onPrint in Project Viewer; no PDF found Yes
Trace logic through the network PartialFragnet built by clicking ties YesTrace forward, backward, driving only PartialLongest Path report YesShow Driving Path
Shared folders and files inside the tool YesFolders, files, reports, templates Add-onAcumen Touchstone portal Nonot found in public docs YesProject folders and share teams
Recipients need no install and no licence YesA link opens in any browser, no account PartialResults sent as Word, PDF or Excel files PartialResults sent as Excel, Word or PowerPoint files PartialNo install; each viewer needs a Toolkit seat
Platform, access and pricing
Runs in a browser on Windows, Mac or iPad YesNothing to install NoWindows desktop; Mac only through Parallels NoWindows only YesBrowser app on AWS
Files stay on your own machine NoUploaded to Azure, Central US YesLocal install; cloud features opt-in YesAnalysis runs on local files NoAWS Ireland; region choice on Enterprise
Your files and reports in one place, open from any device YesHosted folders: schedules, reports, templates, look-aheads; sign in from any browser NoDesktop files on each machine NoDesktop files on each machine YesHosted; viewer seats in bundles
Team seats managed by an admin YesGroup plan, each seat $25 / month or $200 / year YesNamed, concurrent-pool and server licences PartialNamed users only; site licence by quote YesBundles of named seats, reassignable
Public list price Yes$25 / month or $200 / year NoThousands a year per seat; exact price by quote Yes$1,575 / user / year or $157.50 / month YesFrom £29.99 / month or £199 / year + VAT
Free trial Yes30 days, no card PartialTrial keys on request Yes10 days Yes30 days, no card
Training and how-to material YesLearn tab: videos and articles; email support YesSupport, consulting, paid training YesVideos, user guide, paid training YesTutorials, forum, webinars
API or batch automation PartialAvailable by quote; built out when asked PartialAPI for custom reports PartialSaved sets start from the command line Nonot found in public docs

Where PC.o is different

  • Standards that fit the purpose. DCMA is the one published standard and PC.o ships it; every other limit depends on what a schedule is for, so instead of one grade for every schedule, a custom report lets people pick their own concerns, limits and warnings per item.
  • Look-aheads. PC.o is the only one of the four that reads an Excel look-ahead workbook, compares it against the schedule and compares several look-aheads with each other.
  • Sharing with people who hold no licence. A link opens the Gantt in any browser with no account, with a password and costs on or off; the desktop tools send files, and XER Schedule Toolkit needs a seat for every viewer.
  • Convert and clean in the same place: Primavera P6 to Project XML and back, either to Excel, global codes to project codes, and costs, quantities and codes removed before a file goes out.
  • The comparison is in the base plan and goes wide: ties, durations, constraints, dates, calendars, codes and critical-path changes, plus early and late cash flow and trends across many updates.
  • Hundreds a year and nothing to learn: five schedule formats and Excel in, nothing to install, a public price of $25 a month or $200 a year and a 30-day trial. Fuse runs to thousands a year per seat and is priced by quote; Steelray is $1,575 a year and covers one scheduling tool per product.

Vendor columns from public documentation, October 2026.

Deltek, Acumen Fuse, Steelray, Steelray Project Analyzer and XER Schedule Toolkit are trademarks of their owners. PC.o is not affiliated with them.